Edit
Certain elements of a schedule or schedules can be edited without the need to open the Schedule Detail screen.
To edit schedules using the right click option:
1. | Navigate to the Scheduling Overview screen |
Main Menu > Scheduling
2. | Use the filters to locate the schedules to be opened. |
3. | Select the desired schedules. |
4. | Right click on the schedules to be edited, click Edit and click on which field should be edited. |
Standard rules apply when editing statuses or visits.
5. | Enter the updated information. |
6. | Click Save. |
Comments
0 comments
Please sign in to leave a comment.